Unlocking High Power Data Centers

The Nexus Power Unit delivers higher efficiency, reliability, and flexibility for HVDC data centers.

Skyrocketing Compute Power Demand Requires the Nexus Power Unit

ISSUES

High power IT racks proposed by NVIDIA.

600kW per rack by 2027

Power equipment lead time

40+ weeks

Traditional Energy Loss

10-15%

One Smart System. Infinite Possibilities.

Traditional AC Approach

Alderbuck HVDC Approach

Reduce project CAPEX

Reduces number of components and integration complexity

Interconnect faster

Reduce equipment lead time and connect to the grid faster with on-site energy management and bi-directional capability.

≥ 96.5% end-to-end
efficiency

Significantly reduce electricity expenses

Talk to Us About Scaling Your Data Center Smarter

Join the growing number of data center operators who are reducing costs and improving efficiency with Alderbuck’s 800VDC NPU system.

Results That Matter

Total 5-Year Impact

Based on a typical 20MW data center facility

$2.7M

Equipment cost savings (20%)

$100K-$150K

Monthly energy savings (3% gain)

50%

Faster deployment