The Nexus Power Unit delivers higher efficiency, reliability, and flexibility for DC data centers.
High power IT racks proposed by NVIDIA.
600kW per rack by 2027
Power equipment lead time
40+ weeks
Traditional Energy Loss
10-15%
Reduces number of components and integration complexity
Reduce equipment lead time and connect to the grid faster with on-site energy management and bi-directional capability.
Significantly reduce electricity expenses
Reach out to discuss how Nexus Power Unit can accelerate interconnection and streamline your site.
Based on a typical 20MW data center facility